Zimbabwe Sites
  • Country Zimbabwe
  • Sites in Country 2
  • Annual Yield (Est) 265 tons
  • Production (%) 9%
  • Our 2 sites in Zimbabwe were only started in 2016 and 2017, both within the eastern province of Goromonzi.
    Both sites are now yielding approximately 265 metric tons a year, which is a 40% increase since they first started production. This contributes to approximately 9% of our annual production.
    Coldwater are keen to further expand their African operational footprint and we are currently carrying out feasibility studies on a site in neighbouring Namibia.